Quantcast Follow-On Maintenance: -725550697

 

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance:
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Installation. -725550696
Up
TM-9-2330-385-14 Palletized Load System Trailer (PLST) Model M1076 Manual
Next
WIRE HARNESS REPLACEMENT (S/N YB6122 075 AND UP).
TM 9-2330-385-14
NOTE
Perform Step (e) if bracket
7
was removed.
1
5
(e)
Install bracket (2) on cross brace (8)
with two screws (7) and locknuts (6).
3
(f)
Connect wire harness (1) to bracket
4
(2) and cover (3) with four screws (4)
2
and locknuts (5).
6
18
NOTE
Install cable ties as required.
(g)
Install wire harness (1) to existing
wire harnesses (18) with cable ties.
8
o.
Follow-On Maintenance:
Connect intervehicular cables, (Para 2-9).
Remove wheel chocks, (Para 2-20).
END OF TASK
4-390.1
4- 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.