Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance:
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2330-385-14
NOTE
Drain valve must be at the
bottom when installing air
reservoir.
U-bolts must be installed
through notches on each end
of bracket.
(24)
Install air reservoir (13) on brackets (14)
with two U-bolts (12) and four
locknuts (11).
(25)
Install air lines 2615 (7) and 2229 (8) on
elbows (9) and (10).
(26)
Install air lines 2228 (1), 2248 (2) and
2224 (3) to elbows (4), (5) and (6).
c.
Follow-On Maintenance:
Charge air system, (Para 2-22).
Check for air leaks, (Para 4-7).
Remove wheel chocks, (Para 2-20).
END OF TASK
4-449

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business