Quantcast Follow-On Maintenance: -725550869

 

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance:
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Installation. (Cont) -725550868
Up
TM-9-2330-385-14 Palletized Load System Trailer (PLST) Model M1076 Manual
Next
DRAWBAR LIFTING HANDLE/TOW RING/ADJUSTING PIN REPLACEMENT.
TM 9-2330-385-14
(22)
Install gasket (6) and hub cap (5) with six
washers (4) and screws (3) on hub (2).
Tighten screws to 180 to 240 lb-in
(20-27 N.m).
Brake drum weighs 125 lbs
(57 kg). Attach suitable lifting
device prior to installation to
prevent possible injury to
personnel.
(23)
Attach lifting device on brake drum (1).
(24)
Using lifting device and the aid of an
assistant, install brake drum (1) on hub (2).
(25)
Remove lifting device from brake drum (1).
d.
Follow-On Maintenance:
Uncage brake, (Para 2-16).
Install wheel, (Para 4-57).
Remove wheel chocks, (Para 2-20).
END OF TASK
4-525

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +