Click here to make tpub.com your Home Page

Page Title: Installation. (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2330-385-14
4-67. FLATRACK AIR CHAMBER REPLACEMENT (CONT).
Use care when installing springs.
Springs are under tension and
can act as projectiles when
released. Injury to personnel
may result.
(9)
Install washer (10), coil spring (11) and
washer (12) on locking pin (8) with cotter
pin (9).
(10)
Turn unlocking rod to the left and remove
from threaded hole (3) of flatrack load
lock (5) to extend load lock.
(11)
Install cap (1) on cable (2) in threaded hole
(3).
c.
Follow-On Maintenance:
Uncage flatrack air chamber, (Para 4-65).
Charge air system, (Para 2-22).
Check for air leaks, (Para 4-7).
Remove wheel chocks, (Para 2-20).
END OF TASK
4-558

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business