Click here to make tpub.com your Home Page

Page Title: Preparation After Rail Shipment.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2330-385-14
(2)
Install reinforcement plate (2) in holes (4) in trailer chassis (5).
(3)
Remove locking pin (6) from reinforcement plate (2).
(4)
Remove transport pin (7) from clip (8) and bracket (9).
(5)
Insert transport pin (7) through hole (10) in reinforcement plate (2), hole (11) in flatrack (12) and hole
(not shown) in trailer rail (13).
(6)
Install locking pin (6) through two tabs on reinforcement plate (2) to secure transport pin (7).
(7)
Repeat steps (1) through (6) for remaining transport pin (7).
Marking. Refer to AR 746-1 for Marking of Supplies for Shipment.
b.
c.
Preparation After Rail Shipment.
(1)
Remove locking pin (6) from reinforcement plate (2).
(2)
Remove transport pin (7) from hole (11) in flatrack (12), hole (10) in reinforcement plate (2) and hole
(not shown) in trailer rail (13).
(3)
Install transport pin (7) on bracket (9) and clip (8).
(4)
Remove reinforcement plate (2) from holes (4) in trailer chassis (5).
(5)
Install reinforcement plate (2) on studs (3) with two locknuts (1).
(6)
Install locking pin (6) on reinforcement plate (2).
(7)
Repeat Steps (1) through (6) for remaining transport pin (7).
d.
Follow-On Maintenance:
Remove wheel chocks, (Para 2-20).
END OF TASK
4-571

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business