Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance:
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2330-385-14
5-22. SPRING REPLACEMENT (AXLE NO. 1) (CONT).
NOTE
Front of spring has a double loop around spring bushing. Ensure spring is installed
correctly.
Do not install front pin all the way in. There must be enough room between pin and
drawbar mount to install the castle nut.
(6)
Install two pins (5), washers (4) and castle
nuts (3) in spring (1) ends. Tighten castle
nuts to 160 lb-ft (217 N.m).
(7)
Align slot in castle nut (3) with hole in
pin (5).
(8)
Install cotter pin (2) in pin (5).
NOTE
Perform Step (9) if grease fittings
were damaged.
(9)
Install new grease fittings (6) in pins (5).
(10)
Remove lifting device from spring (1).
(11)
Repeat Steps (1) through (10) for opposite
side front spring.
c.
Follow-On Maintenance:
Install axle, (Para 5-14).
Lubricate fittings, (Para 4-8).
Remove wheel chocks, (Para 2-20).
END OF TASK
5-78

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business