Click here to make tpub.com your Home Page

Page Title: OPERATION UNDER USUAL CONDITIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-3990-206-14&P
Section II. OPERATION UNDER USUAL CONDITIONS
2-7. ASSEMBLY AND PREPARATION FOR USE.
Unpacking. Refer to Chapter 4, Unpacking and Packing, for unpacking instructions.
a.
b.  Assembly and Installation. Refer to Chapter 4, Loose Parts Installation, for assembly and installation
instructions, including removal of rollers from stowage points. Refer to Sideboard Kit, Para 2-9 if sideboards and
straps must be installed.
c.
Lock and Unlock Front ISO Locks.
Ensure all ISO container locks are unlocked before trying to load container on flatrack.
Damage to both container and ISO locks could occur if locks are not correct.
Ensure sideboards have been removed from flatrack before trying to load ISO container
or damage to equipment may result.
NOTE
Steps (1) and (2) must be performed before loading ISO container.
(1)
Lift up on handle (1) and rotate to the left to lift lock body (2).
(2)
Twist handle (1) further to allow top (3) of lock to be in position to engage ISO container.
(3)
After installing ISO container, twist handle (1) to lock ISO container and flatrack together.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business