Quantcast SIDEBOARD KIT. -724650035

 

Click here to make tpub.com your Home Page

Page Title: SIDEBOARD KIT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
DECALS AND INSTRUCTION PLATES. -724650034
Up
TM-9-3990-206-14-P Palletized Load System (PLS) FlatrackM1074/M1075 Manual
Next
FLATRACK STACKING AND LOADING ON PLS.
TM 9-3990-206-14&P
a.
Installation.
2
5
4
1
3
Sideboards and straps secure the load to flatrack. Install sideboards and straps to flatrack
before trying to move load or damage to equipment or the load may result.
NOTE
Refer to illustration for correct panel location.
For installation of panels No. 9 and No. 10, refer to Para 4-19.
(1)
Line up stakes (1) of sideboard sections (2) with pockets (3) on flatrack. Push sideboard sections down
until seated in pockets.
(2)
Anchor sideboard sections (2) to sideboard pockets (3) with retaining clips (4).
(3)
Install tiedown straps to cargo.
b.
Removal.
(1)
Remove tiedown straps from cargo and stow in stowage box (5).
(2)
Remove retaining clips (4) from sideboard pockets (3) and stakes (1).
(3)
Lift sideboard sections (2) out of pockets (3).
2-10. NUCLEAR, BIOLOGICAL AND CHEMICAL (NBC) DECONTAMINATION
PROCEDURES.
Perform Chemical, Biological, and Radiological Decontamination procedures.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.