Click here to make tpub.com your Home Page

Page Title: Alternate Flatrack Stacking Procedure.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-3990-206-14&P
c.
Alternate Flatrack Stacking Procedure.
Flatracks must be empty when stacked. Attempting to stack loaded flatracks could cause
serious injury or death to personnel.
Rollers must be installed on flatrack prior to performing this procedure. Failure to comply
could result in damage to equipment.
NOTE
This procedure can be performed with one vehicle.
Tiedown rings must be off top of bed prior to performing this procedure.
(1)
Position PLS truck No. 1 (1) in front of flatrack No. 1 (2).
Push up and turn handle (3) on two front locks (4) to UNLOCK position as shown.
(2)
(3)
Remove pin (5) from rear extension (6) and rotate extension (6) outward.
(4)
Install pin (5) to secure rear extension (6) in place.
2-18.2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business