Click here to make tpub.com your Home Page

Page Title: Alternate Flatrack Stacking Procedure. (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-3990-206-14&P
NOTE
Flatrack is in LOCKED position when top of lock is positioned across flatrack mount as
shown.
(7)
Turn handle (3) on two locks (4) until flatrack No. 2 (8) is locked in.
Remove pin (9) from lock (10) and rotate lock (10) to LOCKED position.
(8)
(9)
Install pin (9) to secure lock (10) in place.
(10) Secure two flat racks together with strap as shown below.
(11) PLS truck No. 2 (7) moves out to stack two more flatracks.
(12) PLS truck No. 1 (1) loads two flatracks No. 1 and 2 (2) and (8) on PLS truck (TM 9-2320-364-10).
(13) PLS truck No. 1 (1) unloads two flatracks No. 1 and 2 (2) and (8) onto PLS trailer (TM 9-2330-385-14),
and reloads two more flatracks or continues the mission.
2-19

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business