Quantcast OPERATOR MAINTENANCE INSTRUCTIONS

 

Click here to make tpub.com your Home Page

Page Title: OPERATOR MAINTENANCE INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
PREPARATION FOR STORAGE OR SHIPMENT. -724650060
Up
TM-9-3990-206-14-P Palletized Load System (PLS) FlatrackM1074/M1075 Manual
Next
ROLLER REPLACEMENT
TM 9-3990-206-14&P
OPERATOR MAINTENANCE INSTRUCTIONS
Para
Contents
Page
Introduction  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Roller Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Section I. MAINTENANCE INSTRUCTIONS
This section covers maintenance tasks authorized at the Operator Level of Maintenance.
3-2. ROLLER REPLACEMENT.
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Flatrack loaded on truck or trailer,
(TM 9-2320-364-10)
a.
Removal.
Roller must be supported while removing retaining pins or roller may drop causing injury to
personnel.
NOTE
This procedure shows replacement of one roller. Replacement is the same for both rollers.
(1)
Remove two holding pins (1) from retaining pins (2).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +