|
|
TB 9-2320-279-13&P-2
DOOR HANDLE ASSEMBLY REPLACEMENT - CONTINUED
0012 00
CLEANING AND INSPECTION
INSTALLATION
1.
Position interior handle spacer (5) and exterior door handle (1) on door assembly.
2.
Install four washers (3) and capscrews (2) on exterior door handle (1).
3.
Install bolt (8) on door cam (7).
4.
Install door cam (7) and interior grab handle (6). Tighten setscrew (4).
5.
Position link rod (11) on bolt (8) and install washer (10) and new locknut (9).
4
5
11
2,3
1
9,10
6
8
7
417-030
6.
Operate door handle to verify correct operation.
END OF WORK PACKAGE
0012 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |