II113300-1-103
Rev. A
Page 83
l)
Drill a 0.875-in.-diameter hole in both Cab Steps, as shown in Figure 64. The steps are
mirror images, and so is the drill pattern.
m) Place three Doublers (P/N 106719-1-103) in the Frame Channel over the three large
holes that receive 0.750-in. bolts (see Figure 65).
n) Using material handling equipment (hoist, forklift, etc.), orient the Left Mineblast Panel
(P/N 113361-1-103) into the installed position and install the 0.500-13 X 1.750-in.-long
bolts into the Left Mineblast Bracket (P/N 113364-1-103). Install one (1)
0.750-10 X 3.250-in.-long bolt into the outermost hole, as shown in Figure 65.
o) Place the Stud Plate (P/N 113375-3-103) into the holes of the Left Mineblast Panel, as
shown in Figure 65.
p) Install the Cover Panel (P/N 113366-1-103) and the Cab Step using the hardware shown
in Figure 65.
q) Install the remaining hardware shown in Figure 65.
r) Place three Doublers (P/N 106719-1-103) in the Frame Channel over the three large
holes that receive 0.750-in. bolts (see Figure 66).
s) Using material handling equipment (hoist, forklift, etc.), orient the Right Mineblast Panel
(P/N 113362-1-103) into the installed position and install the 0.500-13 X 1.750-in.-long
bolts into the Right Mineblast Bracket (P/N 113365-1-103). Install one (1)
0.750-10 X 3.250-in.-long bolt into the outermost hole, as shown in Figure 66.
t)
Place the Stud Plate (P/N 113375-3-103) into the holes of the Right Mineblast Panel, as
shown in Figure 66.
u) Install the Cover Panel (P/N 113366-2-103) and the Cab Step using the hardware shown
in Figure 66.
v) Install the remaining hardware shown in Figure 66.
0037 00-95
|