Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-13. Right Hand Crane and Outrigger Jack Control Panel
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-10      2-33 Figure 2-13. Right Hand Crane and Outrigger Jack Control Panel Key Control or Indicator Function 1 SWING Control Lever Moves  boom  clockwise  and  counterclock- wise. TELESCOPE   and   HOIST   control   levers should be operated at the same time or hook block will contact boom tip and cause damage. 2 TELESCOPE Control Lever Move TELESCOPE control lever to OUT position to extend the boom.  Move TELESCOPE control lever to IN position to retract the boom. 3 BOOM Lift Control Lever Raises and lowers the boom. 4 HOIST Control Lever Reels in and pays out the cable. 5 MHC MAIN HYDRAULIC PRESSURE MANUAL OVERRIDE Provides emergency hydraulic power when electrical power fails that results in loss of outrigger jack and crane function. 6 RH O/R JACK Control Lever Lowers and raises the right outrigger jack. 7 MAST Control Lever Raises the mast to operating position and lowers the mast to stowage position.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business