| |
TM 9-2320-364-10
2-154
2-12. PREPARATION FOR OPERATION (CONT).
b.
Install Foot Rest.
(1)
Lift foot rest (1) up.
(2)
Pull foot rest leg (2) outward until it contacts the bottom of foot rest.
(3)
Lower foot rest (1) to floor.
c.
Stow Foot Rest.
(1)
Lift foot rest (1) up.
(2)
Push foot rest leg (2) under foot rest (1) until it contacts bottom of the foot
rest.
(3)
Lower foot rest (1) to floor.
|