Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Telescope Boom Out, Boom Up Boom Down and Hoist Up functions
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-10      2-353 NOTE When crane is overloaded, the overload shutdown system will automatically shut off power to Telescope Boom Out, Boom Up Boom Down and Hoist Up functions.  Overload condition can be corrected by using Hoist Down function to lower load to ground or other supporting surface.  All crane functions will be restored in about six seconds, after overload condition is eliminated. It is normal for fluctuation of the engine rpm to occur whenever a change in load on the engine occurs. (3) Move HOIST control lever (15) to UP position to lift load.  Move BOOM control lever (21) to UP position to raise load and bring load closer to crane.  Use SWING control lever (25) to rotate crane to desired location to deposit load. (4) Move HOIST control lever (15) to DOWN position to lower load.  Move BOOM control lever (21) to DOWN position (telescope function can also be used to adjust the load position for setting down) to lower load and move load away from crane. (5) Shut down crane (Para 2-30e).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business