| |
TM 9-2320-364-10
2-356
2-30. MATERIAL HANDLING CRANE (MHC) OPERATION
(MANUAL CONTROLS) (CONT).
If hoist cable has excessive tension when crane is stowed,
boom nose will contact hook block during driving operations
and damage will result.
(5)
Connect load hook (17) to hook block tiedown (18). Remove pin (19) from
upper hole and install in lower hole. Move HOIST control lever (15) to UP
position to remove slack from hoist cable (16).
|