TM 9-2320-364-10
2-358
2-30. MATERIAL HANDLING CRANE (MHC) OPERATION
(MANUAL CONTROLS) (CONT).
(3)
Install two retaining pins (10) in outrigger jack pads (8).
(4)
Stow the outrigger jack pads (8) on crane subframe (9).
(5)
Install the safety pins (7) through crane subframe (9).
(6)
Push the ENGINE HIGH IDLE latch switch (6) to UNLATCH
position and release.
(7)
Turn the crane main power switch (5) to OFF position.
|