| |
TM 9-2320-364-10
2-376
2-31. MATERIAL HANDLING CRANE (MHC) OPERATION
(REMOTE CONTROLS) (CONT).
(4)
Move the HOIST control lever (19) to DOWN position to lower the load.
Move BOOM control lever (24) to DOWN position to lower load further
and move load away from crane as necessary.
(5)
Lower load (23) until properly positioned.
Shut off and remove REMOTE CONTROL UNIT from
around neck and shoulders prior to climbing on truck, flatrack
or load or serious injury or death to personnel may result.
(6)
Turn REMOTE CONTROL EMERGENCY STOP ON/OFF power
switch (13) to OFF and disconnect load (23).
|