Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Crane Emergency Procedures
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-10 2-774      2-57.  EMERGENCY PROCEDURES (CONT). c. Crane Emergency Procedures. (1) Crane emergency operation with electrical failure: Do not try to operate any electrical equipment on truck or crane if electrical failure has occurred.  Damage to equipment could result. NOTE This procedure will provide emergency hydraulic power to lower crane and load when electrical power has failed. Failure of hydraulic system will stop operation of any crane, winch or hydraulic motor on truck.  All cranes and winches are equipped with automatic locking mechanisms to hold cranes and winches in position they were in before hydraulics failed. (a) Twist and pull out MHC Main Hydraulic Override Valve (1).  Remove safety wire (2) and push in and hold MHC Hydraulic System Manual Override button (3). (b) Stow crane (Para 2-30). (c) Notify Unit Maintenance.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business