Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. Preparation After Lift.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-10      2-813 NOTE Both shackles are installed the same way.  Left shackle is shown. (17) Attach towing shackle (25) to bracket (27) using screw (24), and cotter pin (23). (18) Repeat Steps (15) through (17) to install right shackle. b. Preparation After Lift. NOTE Both shackles are removed the same way.  Left shackle is shown. (1) Remove cotter pin (23), screw (24) and towing shackle (25) from bracket (27). (2) Repeat Step (1) to remove right shackle.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business