| |
TM 9-2320-364-20-2
2-1571
Is continuity measured on wire 1120 between
rectifier M66 and buzzer?
(1) If there is no continuity, repair wire
1120 (see schematic Fig 2-28) or
replace harness (Para 7-14). Verify
repair, go to Step 4 of this Fault.
(2) If there is continuity, go to Step 3
of this Fault.
CONTINUITY TEST
Remove all jewelry such as rings, dog tags, bracelets, etc. If jewelry or tools contact positive electrical
circuits a direct short may result. Damage to equipment, injury or death to personnel may occur.
|