| |
TM 9-2320-364-20-3
2-2692
10. OUTRIGGERS DO NOT OPERATE (CONT).
11.
Repair black wire (see
schematic Fig 2-58)
or notify DS
Maintenance.
Verify repair, go to
Step 24 of this Fault.
YES
NO
WINCH/CRANE switch in
CRANE position.
Self recovery winch operates.
Hose 2902 OK.
Crane hoses and tubes OK.
Wire 1738 OK.
White wire from truck connector
MC29 to rectifier OK.
Rectifier OK.
White wire from rectifier to
POWER switch OK.
POWER switch OK.
Black wire from POWER
switch to OSS faulty.
OSS faulty.
Red wire from OSS to crane
junction box, terminal 19
faulty.
Outrigger/mast shutdown
valve harness connector
white wire faulty.
Outrigger/mast shutdown
valve harness connector
black wire faulty.
WINCH/CRANE switch faulty.
Wire 1731 faulty.
Black wire from truck
connector MC29 to system
shutdown relay faulty.
System shutdown relay faulty.
White wire from system
shutdown relay to crane
junction box, terminal 3
faulty.
Main hydraulic pressure valve
harness connector white
wire faulty.
Main hydraulic pressure valve
harness connector black
wire faulty.
KNOWN INFO
POSSIBLE PROBLEMS
TEST OPTIONS
REASON FOR QUESTION
Voltage test.
STE/ICE-R #89.
If black wire from crane POWER
switch through terminal A to
OSS is faulty, 22 to 28 vdc will
not be input to outrigger/mast
shutdown valve solenoid.
WARNING
Are 22 to
28 vdc
measured at
terminal A of top OSS
(overload shutdown system)
connector removed from OSS
with ENGINE switch and
crane POWER switch in the
ON position?
Read WARNING
on Page 2-2693
|