| |
TM 9-2320-364-20-4
6-9
Note location and remove cable ties as required.
Connectors are disconnected by gently prying up on tab and pulling connectors apart.
(12)
Disconnect MC23 connector (31) from ether start valve (32).
(13)
Remove ether injection tube (33) from ether start valve (32).
NOTE
Note routing of overflow tube prior to removal.
(14)
Pull radiator overflow tube (34) up and out of way.
(15)
Remove preformed packing (35) and hose 2773 (36) from elbow (37). Discard preformed packing.
(16)
Remove locknut (38), screw (39) and clip (40) from bracket (41). Discard locknut.
|