| |
TM 9-2320-364-20-4
6-56
6-8. COOLING SYSTEM HOSES AND TUBES REPLACEMENT (CONT).
b.
Follow-On Maintenance:
Fill cooling system with coolant, (Para 6-4).
Start engine, (TM 9-2320-364-10).
Allow engine to run for three minutes.
Shut OFF engine, (TM 9-2320-364-10).
Check for leaks (TM 9-2320-364-10).
Install left front and rear skirt, (Para 17-34).
Install right front and rear skirt, (Para 17-33).
Install cab engine access panel, (Para 17-24).
Close front access cover, (TM 9-2320-364-10).
Install spare tire, (TM 9-2320-364-10).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|