| |
TM 9-2320-364-20-4
11-13
Materials/Parts
Cable Ties (Item 25, Appendix C)
Sealing Compound (Item 72, Appendix C)
Tags, Identification (Item 88, Appendix C)
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Materials/Parts - Continued
Locknut (Item 140, Appendix F)
Lockwasher (Item 201, Appendix F)
Packing, Preformed (2) (Item 257, Appendix F)
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Air system drained, (TM 9-2320-364-10)
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(Item 74, Appendix G)
Cap and Plug Set (Item 8, Appendix G)
11-7. AXLE NO. 3 LOCKING CYLINDER LINES AND FITTINGS REPLACEMENT.
a.
Removal.
NOTE
Tag and mark air lines prior
to removal.
Cap or plug all hoses, tubes,
fittings and openings as each
item is removed.
Remove cable ties as
required.
(1)
Disconnect air line 2421 (1) from fitting (2).
(2)
Remove fitting (2) from locking cylinder (3).
(3)
Remove washer (4) and preformed
packing (5) from fitting (2). Discard
preformed packing.
|