| |
TM 9-2320-364-20-5
15-32
Materials/Parts
Locknut (2) (Item 112, Appendix F)
This task covers:
a. Axle No. 1, 2 and 4 Right Hand Side
d. Axle No. 5 Right and Left Hand Side
b. Axle No. 1, 2 and 4 Left Hand Side
e. Follow-On Maintenance
c. Axle No. 3 Right and Left Hand Side
INITIAL SETUP
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(Item 74, Appendix G)
15-12. AXLE STOP REPLACEMENT.
(1)
Removal.
(a)
Remove two locknuts (1), screws (2) and axle stop bracket (3) from truck (4). Discard locknuts.
(b)
Remove screw (5) and axle stop (6) from axle stop bracket (3).
(2)
Installation.
(a)
Install axle stop (6) and screw (5) on axle stop bracket (3).
NOTE
Position axle stop bracket tight on frame of truck.
(b)
Install axle stop bracket (3), two screws (2) and locknuts (1) on truck (4).
|