| |
TM 9-2320-364-20-5
15-73
Wire rope can become
frayed or contain broken
wires. Wear heavy leather-
palmed work gloves when
handling wire rope. Frayed
or broken wires can cause
injury to personnel.
Never let moving wire rope
slide through hands, even
when wearing gloves. A
broken wire could cut
through glove and can cause
injury to personnel.
(3)
Install wire rope (4) on hoist assembly (6).
(4)
Install wire rope (4) on winch (5) with
screw (3), bracket (2) and nut (1).
(5)
With the aid of an assistant, wind rope (4)
on winch (5).
c.
Follow-On Maintenance:
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|