| |
TM 9-2320-364-20-5
13-2
This task covers:
a. Disassembly
c. Assembly
b. Cleaning/Inspection
d. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheel and tire removed from truck,
(TM 9-2320-364-10)
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(Item 74, Appendix G)
Multiplier, Torque (Item 45, Appendix G)
Repair Tool, Pneumatic Tire, Valve
(Item 56, Appendix G)
Socket Set, 3/4 in. (Item 61, Appendix G)
Socket Set, 3/8 in. (Item 62, Appendix G)
Wrench, Torque (0 to 300 lb-ft [0 to 407 N.m])
(Item 96, Appendix G)
Wrench, Torque (0 to 60 N.m)
(Item 98, Appendix G)
Lifting Device
(Minimum Capacity 600 lbs [272 kg])
Wooden Block (Appendix D)
Materials/Parts
Lubricant, Tire and Rim (Item 53, Appendix C)
Sealing Compound (Item 74, Appendix C)
Grommet (2) (Item 72, Appendix F)
Locknut (4) (Item 122, Appendix F)
Packing, Preformed (Item 246, Appendix F)
Packing, Preformed (2) (Item 262, Appendix F)
Valve Core (Item 342, Appendix F)
13-2. WHEEL/TIRE ASSEMBLY REPAIR.
References
TM 9-2610-200-14
|