Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: d. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5      18-11 Adhesives, solvents and sealing compounds can burn easily, can give off harmful vapors and are harmful to skin and clothing.  To avoid injury or death, keep away from open fire and use in well- ventilated area.  If adhesive, solvent or sealing compound gets on skin or clothing, wash immediately with soap and water. If installing new wear pad or changing shim amount or size, ensure correct screw is installed. Screw must not protrude through wear pad and wear pad must fit tight or damage to equipment may result. NOTE Wear pad may or may not require shims. (7) Apply sealing compound to threads of two screws  (3). (8) Install wear pad (6), shim(s) (5), two washers (4) and screws (3) to inner-mid section (7).  Tighten screws (3) to 31 lb-ft (42 N.m). (9) Apply grease to wear pad (6). (10) Repeat Steps (7) through (9) for outer-mid section and boom base section. d. Follow-On Maintenance: Load test crane, (TM 9-2320-364-34-2). Stow crane, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK 5 6 3 4 7

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business