| |
TM 9-2320-364-20-5
18-88
18-18. OUTRIGGER PADS REPAIR (CONT).
c.
(1)
Install two washers (9), cables (8), washers (7) and nuts (6) on crane frame (10).
(2)
Install two chains (5) and rings (4) on
pins (6).
(3)
Install two pins (2) on outrigger (3) with
cotter pins (1).
d.
Follow-On Maintenance:
Install outrigger pads, (TM 9-2320-364-10).
END OF TASK
|