| |
TM 9-2320-364-20-5
19-28
19-10. AIR HORN REPLACEMENT (CONT).
c.
Follow-On Maintenance:
Start engine, (TM 9-2320-364-10).
Build up air pressure to 90 psi (621 kPa), (TM 9-2320-364-10).
Check operation of air horn.
Shut off engine, (TM 9-2320-364-10).
Check connections for leaks.
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
2
3
5
6
4
1
|