| |
TM 9-2320-364-20-5
19-39
NOTE
Steps (15) through (18) are performed outside of the truck.
(15)
Remove four plugs from two heater hoses (18) and (21) and heater assembly (12).
(16)
Install heater hose (18) on heater assembly (12) and tighten hose clamp (17).
(17)
Install heater hose (21) on heater assembly (12) and tighten two hose clamps (19) and (20).
(18)
Close front access cover (16).
NOTE
Remaining steps are performed inside cab.
Valves are opened by turning counterclockwise.
(19)
Open two valves (15) at right front engine.
c.
Follow-On Maintenance:
Install heater front cover, (Para 17-5).
Install heater compartment access panel, (Para 17-4).
Install electronic control box cover, (Para 17-22).
Install cab engine access panel, (Para 17-24).
Fill radiator, (Para 2-9).
Connect batteries, (Para 7-87).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|