| |
TM 9-2320-364-20-5
19-47
NOTE
Remaining steps are performed
inside cab.
Valves are opened by turning
counterclockwise.
(9)
Open two valves (2) at right front of engine.
c.
Follow-On Maintenance:
Fill cooling system, (Para 2-9).
Install heater compartment access panel, (Para 17-4).
Connect batteries, (Para 7-87).
Install cab engine access panel, (Para 17-24).
Start engine and run until it reaches operating temperature, (TM 9-2320-364-10).
Shut OFF engine, (TM 9-2320-364-10).
Check for coolant leaks, (TM 9-2320-364-10).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|