Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5      19-75 NOTE DEF/CAB and RECIPR/FA cables are positioned between inner defrost tubings and between upper plenums. (14) Install upper plenums (2) on lower plenum (11) and heater (7) with six screw washer assemblies (3) and two screws (4), washers (5) and lockwashers (6). (15) Install gasket strip (1) on plenums (2). c. Follow-On Maintenance. Install instrument panel, (Para 7-13). Install heater compartment access panel, (Para 17-4). Check operation of heater and defroster, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK 1 3 5 6 4 2 7 1 1

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business