Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5      21-11 (9) Install negative battery post terminal (11) on battery cable 1137 (12) with screw (10), two washers (9), lockwasher (8) and nut (7). While applying torque to nut, hold screw with wrench or damage to battery may occur. (10) Tighten nut (7) to 12 to 16 lb-ft (16-22 N.m). (11) Install positive battery post terminal (5) on battery cable 1139 (6) with screw (4), two washers (3), lockwasher (2) and nut (1). While applying torque to nut, hold screw with wrench or damage to battery may occur. (12) Tighten nut (1) to 12 to 16 lb-ft (16-22 N.m). c. Follow-On Maintenance: Install arctic kit batteries, (Para 21-4). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK 4 10 5 6 3 2 1 9 11 12 9 8 7 3

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business