| |
TM 9-2320-364-20-5
21-35
NOTE
Connectors are removed by
gently prying up on tab and
pulling connectors apart.
Tag and mark all wires and
connectors prior to removal.
Remove cable ties as
required.
(2)
Disconnect MC101 connector (4).
(3)
Loosen screw (5) and remove wire 1340 (6)
from 24V receptacle (7).
(4)
Support 24V receptacle (7) and remove
nut (8) and wire 1435 (9) from 24V
receptacle (7).
b.
Installation.
NOTE
Install cable ties as required.
(1)
Support 24V receptacle (7) and install wire
1435 (9) and nut (8) on 24V receptacle (7).
(2)
Install wire 1340 (6) on 24V receptacle (7)
and tighten screw (5).
(3)
Connect MC101 connector (4).
(4)
Install left and right ECB covers (2) on
ECB (3) with 15 screws (1).
c.
Follow-On Maintenance:
Connect batteries, (Para 7-87).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|