| |
TM 9-2320-364-20-5
21-83
(2)
Disconnect MC82B connector (3) from
CHU control box (4).
(3)
Remove CHU jumper harness (5) from
truck.
b.
Installation.
NOTE
Install cable ties as required.
Position CHU jumperwire
harness as noted during
removal.
(1)
Position CHU jumper harness (5) in truck.
(2)
Connect MC82B connector (3) to CHU
control box (4).
(3)
Connect MC85 connector (1) to LHS main
junction box (2).
c.
Follow-on Maintenance:
Install deck weldment (left side only), (Para 21-40).
Connect batteries, (Para 7-87).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
3
4
5
2
1
|