| |
TM 9-2320-364-20-5
21-94
21-22. CONTAINER HANDLING UNIT (CHU) CONTROL BOX WIRING
REPLACEMENT (CONT).
b.
Installation.
NOTE
Connect only wires required to complete task. Refer to Table 21-2 CHU Control Box Wiring
for specific control box wiring replacement.
(1)
Follow Table 21-2 to connect wires.
(2)
Install connectors MC185 (4), MC82B (3) and MC82A (2) to control box (5) using three nuts (1).
c.
Follow-On Maintenance:
Install CHU control box assembly, (Para 21-21).
Connect batteries, (Para 7-87).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
8
7
6
5
4
3
2
1
1
1
|