| |
TM 9-2320-364-20-5
21-204
21-40. CONTAINER HANDLING UNIT (CHU) DECK WELDMENT
REPLACEMENT (CONT).
b.
Installation.
NOTE
Left and right deck weldments are
identical. Right deck weldment is
shown.
(1)
Position deck weldment (5) on front support
assembly (5).
(2)
Install six washers (8), two lockwashers (7)
and screws (6) and deck weldment (5) on
front support assembly (5).
(3)
Install two washers (3), lockwashers (2) and
screws (1) to deck weldment (5) and front
support assembly (5).
c.
Follow-on Maintenance:
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
1
6
2
3
5
8
5
7
8
|