Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: f. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5 13-50      13-11.  CENTRAL TIRE INFLATION SYSTEM (CTIS) WHEEL VALVE REPAIR (CONT). (17) Lower jack until tire (2) is on ground and remove jack from under axle (1). (18) Install valve stem dust cap (3) on valve stem (4). f. Follow-On Maintenance: Start engine, (TM 9-2320-364-10). Build up air pressure to 125 psi (861 kPa). Check CTIS operation, (TM 9-2320-364-10) Shut OFF engine, (TM 9-2320-364-10). Check for air leaks, (TM 9-2320-364-10). Install wheel cover, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK 13-12.  TIRE REPAIR. Refer to TM 9-2610-200-14, Operator/Unit/Direct Support/General Support Maintenance Manual for care, maintenance, repair and inspection of pneumatic tires and inner tubes.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business