| |
TM 9-2320-364-34-2
3-159
b.
Installation.
(1)
Position gasket (5) and oil pressure regulator valve (1) on engine block (4).
(2)
Install two lockwashers (3) and screws (2) in oil pressure regulator valve (1), gasket (5) and engine
block (4). Tighten screws (2) to 30 to 35 lb-ft (41 to 47 N.m).
c.
Follow-On Maintenance:
Install oil pan, (Para 3-22).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|