| |
TM 9-2320-364-34-2
6-60
Materials/Parts
Adhesive (Item 2, Appendix B)
Kit, Wire gate (Item 160, Appendix E)
Locknut (Item 171, Appendix E)
Packing, Preformed (4) (Item 357, Appendix E)
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Engine Off, (TM 9-2320-364-10)
Wheels Chocked, (TM 9-2320-364-10)
Crane Unstowed, (TM 9-2320-364-10)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
6-7. OVERLOAD SHUTDOWN SYSTEM WIRE GASKET REPLACEMENT.
a.
Removal.
(1)
Remove four screws (1), and preformed packings (2) from cover (3). Discard Preformed packings.
(2)
Remove cover (3) from crane overload control (4) and position on boom (5).
(3)
Remove locknut (6), screw (7) and ground wire (8), from cover (3). Discard locknut.
(4)
Remove cover (3) from boom (5).
(5)
Remove and discard two screws (9) from wire gate clamp (10).
(6)
Remove and discard seven nuts (11), star washers (12), screws (13), wire gate clamp (10) and wire gate
(14), from cover (3).
(7)
Remove adhesive from cover (3).
|