Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 6-30. CRANE WIRING REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-2      6-289 Materials/Parts Cable Ties (Item 9, Appendix B) Sealing Compound (Item 56, Appendix B) Tags, Identification (Item 72, Appendix B) Lockwasher (Item 228, Appendix E) This task covers: a.  Junction Box Wiring Replacement e.   Central Solenoid Harness Replacement b.  Power Cable Replacement f.    On/Off and High Idle Harness Replacement c.  Remote Control Harness Replacement g.   Follow-On Maintenance d.  Overload Shutdown Cable Replacement INITIAL SETUP Equipment Condition Engine OFF, (TM 9-2320-364-10) Wheels chocked, (TM 9-2320-364-10) Crane erected, (TM 9-2320-364-10) Batteries disconnected, (TM 9-2320-364-20) Tools and Special Tools Tool Kit, General Mechanic’s (Item 240, Appendix F) 6-30.  CRANE WIRING REPLACEMENT. Materials/Parts - Continued Lockwasher (8) (Item 282, Appendix E) a. Junction Box Wiring Replacement. NOTE This procedure shows removal of crane wiring from several different sources.  Only remove wiring that is required to complete the task. (1) Removal. (a) Loosen six screws (1), move clips (2) aside and remove cover (3) from junction box (4).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business