TM 9-2320-364-34-2
3-10
Materials/Parts
Fuel Pipe, Jumper (Item 53, Appendix E)
Packing, Preformed (32) (Item 380, Appendix E)
Packing, Preformed (4) (Item 563, Appendix E)
This task covers:
a. Compression Check
b. Follow-On Maintenance
INITIAL SETUP
Personnel Required
Two
Equipment Condition
Engine OFF (TM 9-2320-364-10)
Wheels chocked (TM 9-2320-364-10)
Rocker covers removed (TM 9-2320-364-20)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 27, Appendix F)
Gage Set, Cylinder Compression
(Item 65, Appendix F)
Gloves, Heavy Duty (Item 82, Appendix F)
Goggles, Industrial (Item 83, Appendix F)
Wrench, Fuel Line Nut (Item 270, Appendix F)
Wrench Set, Socket 3/8 in. Drive
(Item 273, Appendix F)
Wrench, Torque, (0-175 lb-ft [0-237 N.m])
(Item 277, Appendix F)
Wrench, Torque, (0-60 N.m)
(Item 276, Appendix F)
3-3. ENGINE TESTING
|