| |
TM 9-2320-364-34-2
6-349
Materials/Parts
Cable Ties (Item 9, Appendix B)
Tags, Identification (Item 72, Appendix B)
Locknut (7) (Item 176, Appendix E)
Lockwasher (Item 251, Appendix E)
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
LHS fully extended, (TM 9-2320-364-10)
Batteries disconnected, (TM 9-2320-364-10)
Left side noise panel removed,
(TM 9-2320-364-20)
Electronic Control Box (ECB) right side
panel removed, (TM 9-2320-364-20)
Electronic Control Box (ECB)
top panels removed, (TM 9-2320-364-20)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
6-35. ECB/TRANSMISSION WIRE HARNESS REPLACEMENT.
a.
Removal.
NOTE
Remove cable ties as required.
Connectors are removed by gently prying on tab and pulling apart connectors.
(1)
Loosen screw (1). Disconnect MC10 connector (2).
(2)
Remove nut (3), lockwasher (4), washer (5),
double braided ground wire (6) and washer
(5) from stud (7). Discard lockwasher.
(3)
Disconnect MC36 connector (8).
(4)
Remove locknut (9), screw (10) and clamp
(11) from MC10 connector (2). Discard
locknut.
(5)
Remove four screws (12), plates (13) and
rubber grommet (14) from electronic control
box (15).
(6)
Push ECB/transmssion wire harness (16)
through ECB (15).
|