| |
TM 9-2320-364-34-2
6-353
b.
Installation.
NOTE
Install cable ties as required.
Evenly distribute any slack
in harness.
(1)
Position ECB/transmission wire harness (16)
in truck.
(2)
Position MC20 connector (36) in clip (39).
(3)
Install cushion clip (39) on bracket (40) with
screw (38) and locknut (37).
(4)
Connect MC20 connector (36).
(5)
Connect MC19 connector (34) to
transmission (35).
|