TM 9-2320-364-34-2
7-28
Materials/Parts
Cable Ties (Item 9, Appendix B)
Gasket (Item 56, Appendix E)
This task covers:
a. Upper Container Removal
c. Transmission Assembly Installation e. Follow On Maintenance
b. Transmission Assembly Removal
Into Container
From Container
d. Upper Container Installation
INITIAL SETUP
Personnel Required
Two
Equipment Condition
Transmission separated from engine, (Para 3-5)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
Wrench, Torque (0-175 lb-ft [0-237 N.m])
(Item 277, Appendix F)
Lifting Device, Minimum Capacity 1061 lbs
(482 kg)
7-11. SHIPPING CONTAINER, TRANSMISSION ASSEMBLY REPLACEMENT.
Materials/Parts - continued
Locknut (24) (Item 199, Appendix E)
Lockwasher (12) (Item 288, Appendix E)
Lockwasher (8) (Item 289, Appendix E)
a.
Upper Container Removal.
Release air pressure prior to
opening container or injury to
personnel could result.
(1)
Release air pressure at breather valve (1) by
pressing air release button (2).
(2)
Remove 22 nuts (3) and screws (4) from
upper and lower container (5) and (6).
Upper container weighs 222 lbs
(101 kg). Attach lifting device
prior to removal to prevent injury
to personnel.
(3)
With the aid of an assistant, attach lifting
device to upper container (5).
(4)
Remove upper container (5) from lower container (6).
(5)
Remove and discard gasket (7) from lower container (6).
(6)
Remove lifting device from upper container (5).
|