TM 9-2320-364-34-2
9-31
Materials/Parts
Adhesive (Item 1, Appendix B)
Sealing Compound (Item 56, Appendix B)
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Personnel Required
Two
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Wheels/tires removed, (TM 9-2320-364-10)
Wheel end oil drained, (TM 9 2320-364-20)
Tools and Special Tools
Tool Kit, General Mechanic’s
(Item 240, Appendix F)
Socket, Socket Head Screw 12 mm
(Item 206, Appendix F)
Wrench, Torque (0-175 lb-ft [0-237 N.m])
(Item 277, Appendix F)
Extractor, Jet (Appendix C)
9-6. AXLE PLANETARY HUB GEARS REPLACEMENT.
Materials/Parts - Continued
Locknut (8) (Item 217, Appendix E)
a.
Removal.
NOTE
All planetary hub gears are removed the same way. Axle No. 1 is shown.
(1)
Remove eight locknuts (1) and washers (2) from studs (3). Discard locknuts.
NOTE
If screw comes off with nut, separate screw from nut and re-install screw.
(2)
Hold hub (4) and remove nut (5) from screw (6).
(3)
Turn screw (6) clockwise until planetary gear carrier assembly (7) is separated from ring gear carrier
assembly (8).
(4)
Turn screw (6) counterclockwise and remove from planetary gear carrier assembly (7).
|