| |
TM 9-2320-364-34-2
10-19
Materials/Parts
Grease (Item 21, Appendix B)
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Cooling assembly removed,
(TM 9-2320-364-20)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
Cap and Plug Set (Item 26, Appendix F)
Wrench, Combination 1-1/2 in.
(Item 260, Appendix F)
Wrench, Crowsfoot, 3/4 in., 3/8 in. Drive
(Item 268, Appendix F)
Wrench, Torque (0 to 175 lb-ft [0-237 N.m])
(Item 277, Appendix F)
Lifting Device, Minimum Capacity 300 lbs
(136 Kg)
10-4. AIR COMPRESSOR REPLACEMENT.
Materials/Parts
Sealing Compound (Item 53, Appendix B)
Tags, Identification (Item 72, Appendix B)
Gasket (Item 67, Appendix E)
Locknut (2) (Item 210, Appendix E)
Lockwasher (2) (Item 251, Appendix E)
Lockwasher (6) (Item 255, Appendix E)
a.
Removal.
NOTE
Tag and mark all hoses, elbows and fittings prior to removal.
Cap and plug all hoses and fittings after removal to prevent contamination.
(1)
Remove hose 2600 (1) from elbow (2).
|